日韩电影免费在线一区二区,亚洲欧美日韩精品视频,最新热久久99这里有精品,欧美黑人粗大猛烈18p

當前位置:首頁   >    產(chǎn)品中心   >    電壓擊穿試驗儀   >    電壓擊穿強度試驗儀   >   BDJC-50KV耐擊穿電壓強度試驗儀 產(chǎn)品展示

耐擊穿電壓強度試驗儀

型 號BDJC-50KV

更新時間2023-08-06

廠商性質(zhì)生產(chǎn)廠家

報價

產(chǎn)品描述:耐擊穿電壓強度試驗儀滿足標準:
GB1408-2006 GB/T1695-2005 GB/T3333 HG/T3330 /GB12656 /ASTM D149 .
GB1408-2006 絕緣材料電氣強度試驗
GB/T1695-2005 硫化橡膠工頻電壓擊穿強度和耐電壓強度試驗
GB/T3333 電纜紙工頻電壓擊穿試驗

產(chǎn)品概述


耐擊穿電壓強度試驗儀滿足標準:

GB1408-2006 GB/T1695-2005 GB/T3333  HG/T3330 /GB12656 /ASTM D149 .

      GB1408-2006 絕緣材料電氣強度試驗

      GB/T1695-2005 硫化橡膠工頻電壓擊穿強度和耐電壓強度試驗

      GB/T3333 電纜紙工頻電壓擊穿試驗

      HG/T 3330絕緣漆漆膜擊穿強度測定

      GB12656 電容器紙工頻電壓擊穿試驗

       ASTM D149 固體電絕緣材料在工業(yè)電源頻率下的介電擊穿電壓和介電強度試驗

10、主機尺寸:長寬高-800*700*1600(MM)

11、操作臺尺寸:長寬高-800*700*650(MM)

12、防護罩材質(zhì):白色透明有機玻璃

13、油槽尺寸:長寬高-300*200*150

14、設(shè)備重量:約100KG


耐擊穿電壓強度試驗儀軟件功能:

    01、軟件平臺:WINDOWS窗口操作平臺,界面直觀,便于操作

02、曲線顯示:在實驗過程中可以動態(tài)顯示試驗曲線

03、數(shù)據(jù)導(dǎo)出:可以對試驗結(jié)果導(dǎo)入EXCEL表格

04、實驗報告:可以人為設(shè)置報告名稱,并對實驗報告進行打印

05、試驗方式:可以根據(jù)需求對直流試驗和交流試驗進行靈活選擇

06、試驗方法:可以根據(jù)需求自行選擇擊穿電壓、耐壓試驗、梯度試驗

07、參數(shù)設(shè)置:可以根據(jù)不同的試驗方式及試驗方法靈活設(shè)置所需的不同參數(shù)值

08、試樣設(shè)置:可對不同標準的試樣參數(shù)靈活設(shè)置

09、人員管理:設(shè)置用戶名及密碼,不同的操作員登入進行不同的試驗,互不影響

10、標準選擇:含有不同標準,可根據(jù)需求自行選擇

11、連續(xù)操作:連續(xù)操作試驗時,可直接在軟件里選擇電機復(fù)位,進行二次試驗


設(shè)備安全保護功能:

 試驗在試驗箱中進行,試驗箱門打開時電源加不到高壓變壓器輸入端,即高壓側(cè)無電壓。100KV測試設(shè)備高壓電極距離試驗箱壁的zui近距離大于370mm,50KV測試設(shè)備高壓電極距離試驗箱壁的zui近距離大于250mm,試驗時即使人接觸箱壁也不會有危險。

 設(shè)備要安裝單獨的保護地線。接保護地線,主要是減少試樣擊穿時對周圍產(chǎn)生的較強的電磁干擾。也可避免控制計算機失控。

 該試驗設(shè)備的電路設(shè)有多項保護措施,主要有:過流保護、失壓保護、漏電保護、短路保護、直流試驗放電報警等。

◆直流試驗放電報警功能:在設(shè)備做完直流試驗時,當開啟試驗門時設(shè)備會自動報警,直至使用設(shè)備上的放電裝置放電后報警會自動取消.(注:因為直流試驗后不放電會危險到人身安全,不能直接拿取電極,起到提醒使用人員放電以免造成人身傷害)。

 試驗放電裝置,隨主機為一體化,改進了以往單獨配備一根放電桿的功能。



技術(shù)指標:

01、輸入電壓: 交流 220 V

02、輸出電壓: 交流 0--100 KV ;

               直流 0—100 KV

03、電器容量: 10KVA

04、高壓分級: 0-100KV

05、升壓速率:0.01-5.0kv

              (備注:滿足標準要求并可以根據(jù)用戶需求設(shè)定不同的升壓速率)

06、試驗方式:

           直流試驗:1、勻速升壓  2、梯度升壓 3、耐壓試驗

           交流試驗:1、勻速升壓 2、梯度升壓 3、耐壓試驗

07、試驗介質(zhì):空氣,試驗油

08、安裝靈敏度較高的過電流保護裝置保證試樣擊穿時在0.05S內(nèi)切斷電源。

09、儀器配備先進的故障報警系統(tǒng) 避免用戶操作故障儀器發(fā)生危險。(上位機報警和下位機報警)


整機組成:

1、升壓部件:由調(diào)壓器和高壓變壓器組成0~50KV的升壓部分。

2、動部件:由步進電機均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。

3檢測部件:由集成電路組成的測量電路。通過信號線把檢測的模擬信號和開關(guān)信號傳給計算機。

4、計算機軟件:通過智能電路把由檢測設(shè)備采集的測控信號傳給計算機。計算機根據(jù)采集的信息控制設(shè)備運行并處理試驗結(jié)果。

5、試驗電極:根據(jù)國家標準(1408.1-2006)隨設(shè)備提供三個電極,具體規(guī)格為:Ф25mm×25mm兩個;Ф75mm×25mm一個。



注意事項:

●本儀器試驗過程中如空氣相對濕度大于70%,兩電極間空氣放電的距離會增加很多,所以試驗中請與儀器保持1.2米的距離。

●本儀器之控制計算機專為電壓擊穿試驗機設(shè)計,請勿隨意添加和刪除程序或移作它用。

●本公司保留對設(shè)備改進的權(quán)利,并不另行通知用戶。



注意事項:

1、介電擊穿強度試驗儀安裝時應(yīng)具有獨立的接地線。
2、在開機前,操作者要首先熟悉操作方法。
3、儀器不能在有強烈腐蝕性氣體及有顆粒雜質(zhì)的氣體環(huán)境中使用。
4、試驗環(huán)境溫度15度到25度之間,相對濕度60%到70%之間
5、試樣擊穿瞬間有火花產(chǎn)生并伴有聲響,屬正?,F(xiàn)象。
6、每次更換試樣或接觸高壓電極時必須用高壓放電棒對高壓電極進行放電,放電時間5秒以上。

7、每次進行試驗前,必須檢查儀器接地。



配置
01
                  試驗主機               一臺
02
                  高壓發(fā)生器             一套

 03                   試驗電極               二套 (國標1408.1)
 04                   試驗油箱               一只
05
                  放電系統(tǒng)               一套
06
                  控制系統(tǒng)               一套
07
                  數(shù)據(jù)采集系統(tǒng)            一套
08
                  試驗軟件                一套 光盤
09
                  計算機                  一套 品牌 可選 PC/EPC
10
                  噴墨打印機              一臺 品牌
11
                  產(chǎn)品使用說明書           一份
12
                  計量證書                 一份
13
                  產(chǎn)品合格證               一份
14
                  電子穩(wěn)壓器               一臺
15
                  藍牙發(fā)射器               一支
16
                  藍牙接收器               一支


安全說明:

試驗在較高電壓下進行,所以我們在設(shè)計時加以必要的保護措施以防止發(fā)生意外。

1.試驗在試驗箱中進行,試樣可放在空氣中或變壓器油中。50KV電壓頭安全放電距離對四周均小于200mm,試驗時即使觸到箱壁也不會發(fā)生危險。

2.升壓變壓器高壓側(cè)尾端及儀器外殼是連接在一起的,即儀器外殼與該地點的地是等電位。

3.電路保護:儀器設(shè)有過流保護、過壓保護、失壓保護、短路保護、漏電保護電路等。


整機組成:

1、升壓部件:由調(diào)壓器和高壓變壓器組成050KV的升壓部分。

2、動部件:由步進電機均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。

3、檢測部件:由集成電路組成的測量電路。通過信號線把檢測的模擬信號和開關(guān)信號傳給計算機

4、計算機軟件:通過智能電路把由檢測設(shè)備采集的測控信號傳給計算機。計算機根據(jù)采集的信息控制設(shè)備運行并處理試驗結(jié)果。

5、試驗電極:根據(jù)國家標準(1408.1-2006)隨設(shè)備提供三個電極,具體規(guī)格為:Ф25mm×25mm兩個;Ф75mm×25mm一個。


交直流試驗的切換

1)本儀器高壓輸出為交流電壓。直流的獲得方式為在原回路中串入高壓硅堆,使測試回路為脈動的直流電壓。實現(xiàn)的過程為,硅堆已經(jīng)在高壓變壓器的高壓絕緣塔中,平時用一個短路桿把高壓硅堆短接。需要直流試驗時,取出短路桿,使高壓硅堆接入測試電路中,這時回路的電壓為脈動的直流電壓。

2)前面板直流交流選擇按鈕。該按鈕的狀態(tài)不能改變設(shè)備輸出的電壓性質(zhì)。按下該按鈕,設(shè)備僅僅是把直流報警電路接入。指示用戶,當打開箱門時,您需要對高壓均壓球放電。轉(zhuǎn)動放電桿,使放電桿的端部銅球接觸高壓均壓球。建議用戶每次放電銅球接觸高壓均壓球時間大于五秒。

3)試驗的交直流電壓切換,主要取決于高壓絕緣塔中的短路桿是否取出。當取出短路桿時,高壓均壓球上的電壓為直流電壓,插入短路桿時,高壓均壓球上的電壓為交流電壓。短路桿的取出、插入?yún)⒖醋髠?cè)的示意圖。

4)在直流試驗時,計算機也要選擇直流狀態(tài),否則測的結(jié)果是不正確的。簡單的說,交流電壓與直流電壓有倍的關(guān)系。


安全保護:

本機具有完善的安全防護措施:

本實驗儀電路保護控制:跳閘后電壓自動回零

1、超壓保護

2、試驗過流保護

3、試驗短路保護

4、安全試驗門保護

5、軟件誤操作保護

6、零電壓復(fù)位保護

7、試驗漏點保護

8、獨立接地保護

9、試驗結(jié)束放電保護

10、設(shè)備故障報警保護



Resistance to breakdown voltage strength tester meets standard:
GB/T1695-2005 GB/T3333 HG/T3330 /GB12656 /ASTM D149 GB1408-2006.
Electrical strength test of GB1408-2006 insulation material
GB/T1695-2005 vulcanized rubber power frequency voltage breakdown strength and endurance test
GB/T3333 cable paper power frequency voltage breakdown test
HG/T 3330 dielectric paint film breakdown strength determination
GB12656 capacitor paper power frequency voltage breakdown test
Dielectric breakdown voltage and dielectric strength test of D149 ASTM solid electrical insulation material in the industrial power supply frequency
10, host size: long width high -800*700*1600 (MM)
11, operating table size: long width high -800*700*650 (MM)
12, shield material: white transparent organic glass
13, oil groove size: long width high -300*200*150
14, equipment weight: about 100KG
The software function of resistance breakdown voltage strength tester:
01, the software platform: WINDOWS window operation platform, the interface is intuitive, easy to operate
02, curves show: in the experimental process can be dynamic display test curve
03. Data export: EXCEL can import the test results
04, the experiment report: can set the report name artificially, and print the experiment report
05. Test method: can choose the DC test and AC test according to the requirement.
06. Test methods: according to the demand of the choice of breakdown voltage, pressure test, gradient test
07, parameter setting: according to different test methods and test methods to set the different parameters flexibly
08. Sample setting: flexible setting for different standard sample parameters
09, personnel management: set the user name and password, different operators to log in for different tests, not affect each other
10, the standard choice: containing different standards, according to the demand to choose their own
11, continuous operation: continuous operation test can be directly in the software to select the motor reset, two trials
The safety protection function of the equipment for the test of the resistance to breakdown voltage:
] test were carried out in a test case, test box door open power does not come to input end of the high voltage transformer, high voltage side voltage free. 100kV test equipment for high voltage electrode distance test chamber wall of the recent distance is more than 370 mm, high-voltage test equipment of high voltage electrode distance test chamber wall of the recent distance greater than 250mm, test even people who come in contact with the wall of the box will not be in danger.
The equipment to install a separate protective ground. Earth wire, the main is to reduce the sample breakdown of the strong electromagnetic interference generated around the. Can also avoid control computer control.
] the test equipment of circuit with several kinds of protective measures, mainly has: over-current protection, loss of voltage protection, leakage protection, short-circuit protection, DC discharge test alarm.
] DC discharge test alarm function: when we finish DC test equipment. When opening the door test equipment will automatically alarm until after using the device discharge discharge device alarm will automatically be cancelled. (Note: because the DC test on it would be dangerous to personal safety, can not be directly fetching electrode to caution the use of personnel discharge so as not to cause physical damage).
The test discharge device, with the host for the integration, improved in the past with separate a discharge pole function.
Resistance breakdown voltage strength tester technical index:
01. Input voltage: AC 220 V
02, output voltage: AC KV 0--100;
DC 0 - 100 KV
03, electrical capacity: 10KVA
04, high pressure classification: 0-100KV
05, boost rate: 0.01-5.0kv
(Note: meet the standard requirements and can set the different boost rate according to the user's needs)
06. Test methods:
DC test: 1, uniform step 2, gradient boost 3, pressure test
AC test: 1, uniform step 2, gradient boost 3, pressure test
07, test medium: air, test oil
08, the installation of the high sensitivity of the overcurrent protection device to ensure that the sample breakdown in the 0.05S within the power.
09, the instrument equipped with advanced fault alarm system to avoid the operation of the user is dangerous. (upper computer alarm and lower computer alarm)
The composition of the whole machine for resistance to breakdown voltage strength tester:
1, boost parts: by the regulator and the high-voltage transformer to form 0 ~ 50KV boost part.
2. Moving parts: the voltage change of the high voltage transformer is adjusted by the uniform adjustment of the stepping motor..
3, detection components: measurement circuit composed of integrated circuit. The analog signal and the switch signal are transmitted to the computer by the signal line..
4, computer software: through the inligent circuit to the detection equipment collected by the measurement and control signal to the computer. The computer controls the equipment according to the information and runs the test results..
5, the test electrode: according to the national standard (1408.1-2006) with the equipment provides three electrodes, specifications: diameter of 25mm * two; a diameter of 75mm x 25mm a.
Attention to the test of resistance to breakdown voltage:
] the test instrument in the process such as air relative humidity above 70%, the air discharge between two electrodes distance will increase a lot, so the test please keep a distance of 1.2 meters and instruments.
The computer - control instrument designed for voltage breakdown tester, please do not arbitrarily add and remove programs or for other purposes.
- the company retains the right to improve the equipment, users without prior notice.
Attention to the test of resistance to breakdown voltage:
1, the dielectric breakdown strength tester should have independent grounding wire.
2, before the boot, the operator to first familiar with the operation method.
3, the instrument can not have strong corrosive gas and particulate impurities

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話:

  • 常用郵箱:

  • 省份:

  • 詳細地址:

  • 補充說明:

  • 驗證碼:

    請輸入計算結(jié)果(填寫阿拉伯數(shù)字),如:三加四=7
聯(lián)系人:陳丹
手機:
18911395947
點擊這里給我發(fā)消息
 
裕民县| 咸宁市| 闻喜县| 黄大仙区| 卓资县| 合作市| 盈江县| 鸡西市| 柳州市| 齐齐哈尔市| 华池县| 承德市| 兴宁市| 沂水县| 铜鼓县| 南皮县| 比如县| 孟州市| 佛山市| 开原市| 华坪县| 新沂市| 福鼎市| 监利县| 凌云县| 新巴尔虎左旗| 铁力市| 雅江县| 蕉岭县| 通江县| 雷波县| 阳春市| 罗城| 民和| 通州区| 连城县| 南昌市| 耒阳市| 丰顺县| 松江区| 杭锦后旗|